Track Performance in Tunnels and Rail Transition Areas with Under Tie Pads and Under Ballast Mats

dc.contributor.authorRiding, Kyle A.
dc.contributor.authorBridge, Jennifer A.
dc.contributor.authorDavis, Justin R.
dc.contributor.authorGuan, Shanyue
dc.contributor.authorGonzalez, Stephen
dc.date.accessioned2022-08-08T19:41:10Z
dc.date.available2022-08-08T19:41:10Z
dc.date.issued2022-06-01
dc.date.published2022-06en_US
dc.description.abstractRailroads have begun to use under tie pads (UTP) and under ballast mats (UBM) in rail track construction to reduce maintenance costs by better distributing loads, reducing the track modulus, and increasing ballast contact areas with ties. Locations such as tunnels, bridges, and bridge approaches are especially strong candidates for UTP and UBM use due to the high support stiffness they provide to the ballast. In this study, the University of Florida (UF) instrumented the Virginia Avenue Tunnel in Washington D.C., which uses UTP and UBM, during construction to monitor track pressure distribution, tie movement, and tunnel floor vibration during the first 20 months of use (July 2018 – February 2020). Track pressure distributions across ties were measured for hundreds of trains at the tunnel floor transition area and inside the tunnel. Measurements showed that the track settlement occurred over the first 6 months of measurement after track was opened, after which it stabilized to less than 0.157 in. (4 mm).en_US
dc.identifier.urihttps://hdl.handle.net/2097/42425
dc.language.isoen_USen_US
dc.publisherRural Railroad Safety Center, Kansas State University.en_US
dc.rightsThis Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).en_US
dc.rights.urihttps://rightsstatements.org/vocab/InC/1.0/en_US
dc.titleTrack Performance in Tunnels and Rail Transition Areas with Under Tie Pads and Under Ballast Matsen_US
dc.typeTexten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
FRA Draft report 062322-ESSIE-CON-11990.pdf
Size:
8.02 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.62 KB
Format:
Item-specific license agreed upon to submission
Description: