Experimental evaluation of remaining prestress force and center negative bending-moment in railroad ties removed from track after 25 years of service

dc.contributor.authorScott, James Daniel
dc.date.accessioned2019-08-15T15:47:45Z
dc.date.available2019-08-15T15:47:45Z
dc.date.graduationmonthAugusten_US
dc.date.issued2019-08-01
dc.date.published2019en_US
dc.description.abstractTo better understand the appropriate level of prestress force necessary in a prestressed concrete railroad tie that will both mitigate the propensity for longitudinal splitting and also result in a long-term service life, a study was conducted on 12 different designs of existing ties removed from track to evaluate the remaining prestress force in the ties. The existing ties selected for the study had performed well in track for over 25 years and remained in good condition upon removal from track, with no signs of longitudinal splitting. Four different experimental test methods were conducted to evaluate the remaining prestress force in the existing ties. The experimental methods used included the flexural crack reopening method, the newly developed direct tension method, the strain gage method, and the measurement of the length change of wires extracted from the ties. New ties were manufactured with internal vibrating-wire strain gages to provide ties with known prestress forces at the time of testing, and used for comparison to the experimental results. Test results indicate that the direct tension test was the most accurate of the four methods, and that existing ties tended to have prestressing forces in the range of 82-93 kips. Additional testing was conducted to evaluate the center negative cracking moments of the existing ties and compare the results to the current requirements of the AREMA Chapter 30 center negative bending-moment test. Results indicate that of the 12 tie designs investigated, 8 would meet the requirements of the AREMA 30 test in their current state. Knowing current condition and track performance of the existing ties, their level of remaining prestress force, and their center negative bending capacity, new ties could be designed with similar parameters to ensure a durable long-term performance in track while reducing the longitudinal splitting propensity of the tie.en_US
dc.description.advisorRobert J. Petermanen_US
dc.description.degreeDoctor of Philosophyen_US
dc.description.departmentDepartment of Civil Engineeringen_US
dc.description.levelDoctoralen_US
dc.description.sponsorshipFederal Railroad Administrationen_US
dc.identifier.urihttp://hdl.handle.net/2097/40050
dc.language.isoenen_US
dc.subjectRailroad tiesen_US
dc.subjectPrestress forceen_US
dc.subjectSplitting propensityen_US
dc.titleExperimental evaluation of remaining prestress force and center negative bending-moment in railroad ties removed from track after 25 years of serviceen_US
dc.typeDissertationen_US

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
JamesScott2019.pdf
Size:
10.17 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.62 KB
Format:
Item-specific license agreed upon to submission
Description: