<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css">
dc.contributor.authorGautam, Prayas
dc.date.accessioned2026-11-17T21:31:08Z
dc.date.graduationmonthDecember
dc.date.issued2026
dc.description.abstractThis study explores whether the modernized 64-bit application of WinDAM C devel- oped by the U.S. Department of Agriculture–Agricultural Research Service (USDA-ARS) and Kansas State University, a program that routes a flood through a reservoir and esti- mates how overtopping and internal erosion of an earthen embankment dam progress toward a breach, is able to reproduce the results of the 32-bit legacy program. We enhanced the 64-bit application by adding several of the missing features of the legacy program as well as updating the data, screens, platform and installer of the stand-alone EFH-2 runoff program. The features extended included the automatic time-increment adjustment, hydrograph re- sampling, results and summary graphs, summary-table field selection, and Latin hypercube sampling of auxiliary-spillway soil properties. Seven example cases were run in the legacy WinDAM C 1.1.15 and in the 64-bit application (Version 1.1.17) using identical input files for each case with the automatic time-increment adjustment off and on. The results written to the output (.OUT) files by each simulator were compared. For the cases with the adjust- ment off, the peak outflow agreed within 0.1 percent for six of the cases and differed by 0.594 percent for the seventh case. For the cases with the adjustment on, the programs agreed as well as or better than without the adjustment for almost all quantities of interest in the two cases where both programs applied the adjustment. The difference of 0.594 percent for the seventh case decreased to 0.0316 percent. Where a difference could be traced, it came from the way in which the two interfaces prepared the input for the simulator or from the spillway simulator code; in the two cases where the simulators received identical input, the small differences came from the 32-bit and 64-bit builds of the dam simulator. The 64-bit applica- tion currently does not apply the adjustment to variable-time hydrographs. The agreement between the two versions of the software only indicates that the results are the same, not that they are correct.
dc.description.advisorMitchell L. Neilsen
dc.description.degreeMaster of Science
dc.description.departmentDepartment of Computer Science
dc.description.levelMasters
dc.identifier.urihttps://hdl.handle.net/2097/47553
dc.subjectWinDAM C, Embankment dam breach, Legacy software modernization, Software validation, Numerical reproducibility, Latin hypercube sampling
dc.titleModernizing and validating WinDAM C: enhancing 64-bit software for earthen dam breach analysis
dc.typeThesis

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
PrayasGautam2026.pdf
Size:
6.49 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.65 KB
Format:
Item-specific license agreed upon to submission
Description: